
Measured, not guessed
Puck Radar sits on a bracket in selected wells and reports the distance to the water surface over LoRaWAN, at the interval you set. A radar does not mind dirt, darkness or damp, and the battery lasts well over ten years.
For street and stormwater departments
A radar sensor in selected wells, a QR code in every well for the sludge truck to check in, and the level history that shows how each well behaves in rain and after emptying. The schedule follows the wells, not the calendar.
The problem today
Street wells and storm drains are emptied on a cycle, because nobody knows what is in them:


Puck Radar sits on a bracket in selected wells and reports the distance to the water surface over LoRaWAN, at the interval you set. A radar does not mind dirt, darkness or damp, and the battery lasts well over ten years.

A QR code inside every well lid. When the sludge truck has emptied a well, the crew scans it and the visit is recorded on that well in Yggio, with the time. Wells without a sensor get a maintenance history too.

How fast a well fills in rain, how fast it drains afterwards, and how the level falls when it has been emptied: Yggio keeps the curves per well, so the department sees which wells silt up fast, which outlets are blocked, and which wells never needed the visit.
Ordinary moments on the street, each one answered with a measurement.

The level rises in every measured well along Storgatan, but well 14 rises faster and stays high when the others fall. A rule in Yggio raises it as an alarm with its place on the map. When the crew starts at seven, the first address is already decided.

The crew empties well 14 and scans the QR code inside the lid. The visit is recorded on that well, with the time, and the level afterwards shows the well draining as it should. No list to fill in, and no doubt later about which wells were done.

The curves from the rainy weeks and the visits tell the department how each well behaves: three wells silt up within weeks, one drains slowly after every rain and needs its outlet cleared, and most of the measured wells did not need the visit at all. The next schedule is written from that, well by well.
More on City, Puck Radar, Traffic signals and street lighting
Pilot
In a pilot in Helsingborg, Puck Radar sits in storm drains and measures the water level, so the city can see how its wells behave in rain and plan their maintenance. The measuring method for wells, with exclusion zones for ledges and fittings, comes from that work. Bring your own well register and the last year’s sludge-suction schedule, and we work out together how many measured wells it takes to plan the rest.
Four steps, from your well register to the next schedule.
Choose the wells: the ones that flood, the ones that always seem full, and a few that never cause trouble, so the data has something to compare.
Install: a Puck Radar on a bracket in each chosen well, a QR code inside every lid in the district, and the wells on the Yggio map with the sludge-suction rounds as they are today.
The rules in Yggio: a level alarm in rain, a slow-drain warning after rain, and the check-in from the QR code recorded on each well.
After the season: the curves per well, the visits that were needed and the ones that were not, and a schedule written from them.
Tell us how many wells you look after, how often they are emptied today, and where the water stood last time it rained hard.
Or write to sales@sensative.com
For IT, procurement and integrators.
Related solutions: City, Traffic signals and street lighting, Data marketplace